ICC IC107PPS6A Manuál

Procházejte online nebo si stáhněte Manuál pro Patch panely ICC IC107PPS6A. ICC IC107PPS6A patch panel Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 2
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
888-ASK-4ICC [email protected] icc.com
© Copyright 2013, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved. MSR-0448-RevB
INSTALLATION INSTRUCTIONS
Blank Patch Panel for Category 6A FTP 10G, 24-Port, 1 RMS
Step 1: Mount the patch panel to the rack using four (4) #12-24 rack
screws.
Step 2: Install the cable management bar onto the rear of the patch
panel. Align the tabs on both sides and push the bracket downward until
fully seated. Use the grounding screw (included) to attach grounding wire
(not included).
Step 3: Insert the CAT 6A FTP modular connector into a port on the patch
panel. Note: Inspect the connector to ensure it is fully seated, and the
front is ush with the panel.
Step 4: Secure the cable to the cable management bar using a nylon
cable tie. Note: A slot on the bar allows you to insert and secure the tie.
Rack
Slot
Grounding screw
Cable tie
Zobrazit stránku 0
1 2

Shrnutí obsahu

Strany 1 - INSTALLATION INSTRUCTIONS

888-ASK-4ICC [email protected] icc.com© Copyright 2013, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved.

Strany 2 - OPTIONAL ACCESSORIES

888-ASK-4ICC [email protected] icc.com© Copyright 2013, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved.

Komentáře k této Příručce

Žádné komentáře